Installation of color steel plate activity room
A prefabricated house is similar to a building, with the surrounding areas and partition walls leveled and reinforced concrete used, making it more sturdy; Then erect columns, connect the skeleton with horizontal beams, and install partitions, exterior wall panels, and door and window frames; Follow to lay the floor, install another layer upwards, and then install the roof truss and roof panels; Afterwards, install doors and windows, and pull vertical supports. Also, there are sanitary ware, hardware, and the like.
In fact, this is a light steel structure, similar to a heavy steel structure factory building.
Concealed construction of activity rooms refers to the parts that will be covered up by the next process after the completion of the previous process, and cannot be inspected after completion. Concealed construction is the key to interior decoration. If the concealed construction is not done well, no matter how beautiful the surface decoration is, it will be in vain.
Hidden engineering can be divided into water installation, electrical installation and moisture-proof (based on actual reports), waterproofing (based on actual reports) and other projects. Each of these projects cannot be ignored. If any link goes wrong, it may cause serious economic losses and even harm personal safety. Identification of construction techniques and materials for waterproofing (based on actual reports) projects to avoid unnecessary economic losses and injuries. Guiyang Activity Room
Maintenance and upkeep of color steel plate activity rooms
After the installation of the color steel activity room is completed, users are not allowed to change the structure without authorization, nor are they allowed to dismantle any bolt components, nor add or reduce partition walls.
2. Light steel components should be coated with maintenance paint once every 1-2 years to extend their lifespan and maintain their appearance.
3. Color steel houses are connected by steel structural components as a whole, and users arrange electrical lighting equipment. Wires cannot be directly tied to the steel structure, and should be isolated and installed with conduit or trunking to avoid electric shock.
4. Light steel structure color steel houses that are all connected by screws should be equipped with commonly used power sockets and other facilities. The exposed power source should not be installed or hung on the steel frame of the color steel house. Square plastic conduit or trunking should be designed and insulated to prevent leakage and electric shock.
5. After the production and installation of color steel houses are completed, non specialized personnel should not modify the structure or circuit design of the house at will. They should not dismantle screws or steel frame accessories of the house structure, nor should they dismantle color steel sandwich panel partitions or add additional partitions. If there is a strong need to increase or decrease partitions, specialized personnel should be notified to solve the problem.
6. After leaving the room, make sure to turn off all power sources to prevent accidents. When using gas stoves or stoves, the color steel room should not be too close to the fire source, and high-power electrical equipment should not be used.
7. Under normal circumstances, the skeleton of a color steel house should be sprayed with paint once or more every 12-24 months to prevent rusting of the steel frame, and the movable house can also make the color steel house beautiful and eye-catching.
—— Contact:Ms. Zhang